Research library · updated 2026-06-10 · public

Robotics Public Signal Timeline v1

Date: 2026-06-10 Owner: Hugo / Genius Team Agent: Finance / Charlie AGT-002 Status: public-safe S3-S5 signal timeline seed Visibility: PUBLIC Related files:

  • knowledge/robotics-research-harness.md
  • knowledge/robotics-signals.md
  • knowledge/robotics-site-outline-v1.md
  • knowledge/robotics-tesla-optimus-evidence-v2.md
  • knowledge/robotics-figure-unitree-evidence-v1.md
  • knowledge/robotics-leaderdrive-public-case-v2.md
  • knowledge/robotics-why-now-catalysts-v1.md

Public-safety: yes. No private portfolio data. No trade recommendation. No paid-report text.

0. One-line answer

截至 2026-06-10,humanoid / embodied AI robotics 的公开 S3-S5 信号已经足够支撑一条 public signal timeline:Tesla 提供产线和设计产能信号,Figure 提供真实部署 KPI 和制造爬坡指标,Unitree 提供低成本硬件和开发平台信号,Leaderdrive / 绿的谐波提供 filing-backed 供应链收入与风险提示。整体结论仍是:行业从 demo cycle 进入 pilot / early deployment / supply-chain validation 的交界处,但还没有全面进入 S5 commercialization proof。🟢/🟠

1. Timeline schema

FieldMeaning
DateEvent date or filing / publication date
Company / layerOEM, platform, supplier, AI stack, or market structure
Signal levelS3 monitoring / S4 material / S5 thesis-changing
EventWhat changed
Material metricQuantified claim with as-of date
Why it mattersThesis relevance
What is still missingEvidence required before upgrading
Source grade🟢 primary / 🟡 secondary / 🟠 estimate / 🔴 guess

2. Public S3-S5 signal timeline

DateCompany / layerSignal levelEventMaterial metricWhy it mattersMissing before S5Source grade
2025-04-22Tesla Optimus / OEM + manufacturingS3/S4Tesla Q1 2025 update says it remained on track for Optimus builds on Fremont pilot production line in 2025 and wider deployment of bots doing useful work across Tesla factories.No unit count disclosed; material claim is existence of Fremont pilot production-line build target as of Q1 2025 filing.Moves Optimus beyond pure demo language into pilot manufacturing and internal factory-use language.Actual units produced, factory robot count, hours worked, uptime, intervention rate, task economics.🟢 Tesla Form 8-K Exhibit 99.1
2025-07-23Tesla Optimus / strategic identityS3Tesla Q2 2025 update frames Tesla as transitioning from EV/energy leader to AI, robotics and related services.Strategic positioning disclosure; no robot KPI.Confirms management narrative, but not commercialization evidence.Production, customers, robot revenue, economics.🟢 Tesla Form 8-K Exhibit 99.1
2025-10-22Tesla Optimus / production infrastructureS4Tesla Q3 2025 update says first-generation production lines for Optimus are being installed in anticipation of volume production.Installation disclosed as of Q3 2025 filing; no achieved output disclosed.Production-line installation is stronger than demo evidence.Output, yield, utilization, production cost, customer deployment.🟢 Tesla Form 8-K Exhibit 99.1
2025-11-19Figure AI / deploymentS4Figure says Figure 02 completed an 11-month deployment at BMW Group Plant Spartanburg.10-hour shifts Monday-Friday; 90,000+ parts loaded; 1,250+ runtime hours; contributed to 30,000+ BMW X3 vehicles; as of Figure post dated 2025-11-19.One of the strongest public humanoid deployment KPI packets: real customer site, task volume, runtime, and production context.Customer-confirmed economics, robot count, contract value, repeat order, full uptime/intervention distribution, payback.🟢 Figure official post
2026-01-27Figure AI / autonomyS3Figure introduces Helix 02 full-body autonomy and says shown demos are fully autonomous, not teleoperated.Figure highlights a 4-minute continuous household task in a kitchen/dishwasher setting; as of 2026-01-27 official post.Useful autonomy evidence, but still video/demo-centric relative to commercial deployment.Long-duration customer-site reliability, many-trial failure distribution, intervention rate, economics.🟢 for company claim / 🟠 commercial implication
2026-01-28Tesla Optimus / manufacturing planS4Tesla Q4 2025 update says Gen 3 Optimus is first mass-production-intended design; preparations underway for first production line, including supply-chain readiness, with start of production planned before end-2026 and eventual planned capacity of 1M robots/year.1M robots/year eventual designed capacity for first line; start of production planned before end-2026; as of Q4 2025 filing.Quantifies the scale ambition and links design, line preparation, and supply chain.Current production rate, achieved yield, cost curve, robot revenue, deployment KPIs.🟢 Tesla Form 8-K Exhibit 99.1
2026-04-22Tesla Optimus / designed capacityS4Tesla Q1 2026 update says preparations for first large-scale Optimus factory will begin shortly in Q2; Fremont first-generation line designed for 1M robots/year; Texas second-generation line designed for long-term annual capacity of 10M robots.Fremont 1M/year designed line; Texas 10M/year long-term designed line; Robotics entries listed as California Optimus — Construction and Texas Optimus — Construction.Highest public Tesla Optimus scale signal so far, but it is capacity design / construction, not current production.Actual output, uptime, yield, unit cost, external paid customer, robot revenue, safety / reliability KPIs.🟢 Tesla Form 8-K Exhibit 99.1
2026-04-23Leaderdrive / 绿的谐波 / supplier filingsS42025 annual report shows filing-backed growth in robotics-relevant components.2025 revenue RMB 570.714m, +47.31%; attributable net profit RMB 124.367m, +121.42%; harmonic reducer sales 425,158 units, +72.48%; industrial and embodied-intelligence robot components revenue RMB 422.528m, gross margin 34.88%.Stronger than concept-stock narrative because it is filing-backed revenue / volume / gross-margin evidence.Named humanoid customer, humanoid-specific revenue split, project volume, contract amount, single-robot value content, margin durability.🟢 2025 annual report
2026-04-29Figure AI / manufacturingS4Figure says BotQ has delivered 350+ Figure 03 robots and improved production rate from 1/day to 1/hour.350+ Figure 03 robots delivered; 24x throughput improvement in under 120 days; EOL first-pass yield >80%; battery-line first-pass yield 99.3%; 500+ battery packs; 9,000+ actuators across 10+ SKUs; as of 2026-04-29 official post.Moves Figure from handcrafted prototype perception toward quantified manufacturing operations.Link production to customer utilization, revenue, backlog, gross margin, field failure / service cost.🟢 Figure official post
2026-05-26Figure AI / commercial deploymentS3/S4Figure announces commercial agreement with Catalyst Brands to deploy humanoids into Catalyst’s distribution and logistics network, starting at Reno, Nevada Distribution Logistics Center.Named commercial agreement and starting location; no robot count, value, or timeline disclosed as of 2026-05-26 official post.Broadens Figure from BMW manufacturing toward logistics/distribution use case.Contract value, robot count, deployment timeline, task KPI, repeat order, customer-confirmed ROI.🟢 Figure official post
2026-06-09Leaderdrive / 绿的谐波 / public-market riskS3/S4 cautionAbnormal-trading announcement says 688017.SH share price rose sharply versus indices and company had no undisclosed major matter.2026-06-04 to 2026-06-08: share price +36.00% vs SSE Composite -3.05% and automation-equipment index +2.13%; company says no undisclosed major matter; as of 2026-06-09公告.Important anti-hype signal: price action can outrun new fundamental disclosure.New official customer/order/revenue disclosure; otherwise do not infer new contract from share-price move.🟢 company/SSE announcement
2026-06-10Unitree / 宇树 / low-cost hardwareS3Unitree official product pages show public humanoid price anchors across R1, G1 and H2.R1 from US$4,900; G1 from US$13.5K; H2 US$29,900; product pages accessed 2026-06-10.Lowers experimentation cost and may expand developer / research / early pilot surface.Humanoid unit shipments, gross margin, customer mix, deployment uptime, task ROI, repeat orders.🟢 Unitree product pages
2026-06-10Unitree / 宇树 + NVIDIA ecosystem / platform toolingS3Unitree H2 Plus and G1-D pages package compute, teleoperation, simulation, data acquisition and model-training workflows around humanoid hardware.H2 Plus: NVIDIA Jetson T5000, FP4 2,070 TFLOPS, Isaac GR00T / TeleOp / Sim references; G1-D: data acquisition / processing / labeling / review / model training / inference toolchain; accessed 2026-06-10.Suggests Unitree is becoming an embodied-AI development surface, not only a robot body vendor.Active developer adoption, dataset scale, production deployments, software/service revenue, customer economics.🟢 Unitree product pages

3. Signal clusters by evidence type

3.1 Production infrastructure signal

  • Tesla: S4 because filings disclose production-line installation, construction status, and designed capacity. 🟢
  • Figure: S4 because official posts disclose delivered robot count, production cadence, yields, battery packs, and actuator output. 🟢
  • Current limitation: infrastructure and manufacturing metrics still need to connect to field utilization and economics. 🟢/🟠

3.2 Deployment KPI signal

  • Figure BMW: S4 because it includes a named customer, real plant context, runtime hours, task count, working-day operation, and vehicle-production contribution. 🟢
  • Catalyst: S3/S4 because “commercial agreement” and named starting site are better than generic partnership language, but still lack economics. 🟢/🟠
  • Current limitation: customer-confirmed ROI, robot count, payback, repeat order, and intervention rate are still missing. 🟢/🟠

3.3 Cost-curve / platform-access signal

  • Unitree R1/G1/H2: S3 because public pricing changes experimentation cost but not deployment proof. 🟢
  • Unitree H2 Plus / G1-D: S3 because tooling around data, teleoperation, simulation and model training is relevant to the embodied-AI bottleneck. 🟢
  • Current limitation: price and tooling do not equal reliability, margin, or customer ROI. 🟢/🟠

3.4 Supplier filing signal

  • Leaderdrive / 绿的谐波: S4 because revenue, shipments, margin, R&D and risk disclosures come from filings / official announcements. 🟢
  • Current limitation: still no named humanoid OEM, contract value, humanoid-specific revenue split, or durable margin proof. 🟢/🟠

4. What is not in the timeline

Excluded as noise unless upgraded:

  • Viral demo videos without runtime, task definition, intervention rate, or trial count. 🟠/🔴
  • TAM-only slides without value capture or margin evidence. 🟠
  • LOI / MOU / strategic cooperation without economics. 🟢/🟠 depending on source.
  • Unsourced supplier lists, teardown speculation, or market rumors. 🔴
  • Share-price moves without new filing-backed fundamental disclosure. 🟢/🟠

5. What would upgrade the sector from S4-heavy to S5

The sector would move closer to S5 if public evidence shows at least two of the following:

  1. Multi-customer paid deployments with robot count, contract value, task scope and timeline. 🟢
  2. Customer-confirmed ROI / payback and repeat orders. 🟢
  3. Field reliability: uptime, intervention rate, task success rate, safety incidents, maintenance cost. 🟢
  4. Manufacturing: quarterly output, yield, cost curve, inventory / delivery reconciliation. 🟢
  5. Supplier filings: humanoid-specific revenue, named customer or program, margin durability and capacity utilization. 🟢
  6. Public robotics revenue / gross margin line item becoming trackable for listed companies. 🟢

6. Common misconceptions

Misconception 1: “有一个 S4 信号就说明产业已经进入规模商业化。”

Correction: S4 说明 thesis 被加强,但还不是 S5。Figure BMW、Tesla designed capacity、Leaderdrive filing growth 都很重要;它们仍缺 economics、repeatability 或 customer-confirmed proof。🟢/🟠

Misconception 2: “产能规划就是实际产量。”

Correction: Tesla 的 1M / 10M 是 designed capacity / long-term designed capacity,不是当前 production rate。需要 output、yield、uptime、cost、deployment data。🟢/🟠

Misconception 3: “低价硬件等于商业化成功。”

Correction: Unitree 低价改变 experimentation cost,但商业化还需要 uptime、support cost、gross margin、deployment ROI 和 repeat orders。🟢/🟠

Misconception 4: “供应链收入增长就等于 humanoid winner。”

Correction: filing-backed 增长比概念叙事强,但还要验证 humanoid-specific exposure、客户、volume、ASP、margin durability 和 architecture risk。🟢/🟠

7. Think Deeper

  1. 如果 Tesla 先实现内部工厂部署而不是外部销售,应该如何把 Optimus 归类:cost-reduction automation、platform option,还是 future service business?
  2. Figure 的 BMW KPI 如果不能复制到第二、第三个客户,S4 deployment signal 应该降级到什么程度?
  3. Unitree 如果把 humanoid body 价格继续压低,价值会迁移到 AI models、data、deployment integration,还是售后服务?
  4. Leaderdrive 的“工业及具身智能机器人零部件”收入如果持续增长但毛利率下行,是正常降本放量还是议价能力不足?
  5. 哪个 S5 信号更先出现:OEM paid deployment economics,还是 supplier humanoid-specific revenue disclosure?

8. Public site section draft

Signal timeline: 从 demo 新闻转向可验证证据

机器人行业过去最容易被 demo 和 TAM 叙事带偏。我们更关心 S3-S5 信号:哪些信息能被公开来源验证,哪些信息能量化,哪些信息真正改变 thesis。

截至 2026-06-10,最重要的公开信号不是单个“赢家”,而是证据类型的变化:Tesla 披露 Optimus 产线安装和 1M / 10M designed capacity;Figure 披露 BMW 产线 1,250+ runtime hours、90,000+ parts 和 BotQ 制造指标;Unitree 披露 R1 from US$4,900、G1 from US$13.5K、H2 US$29,900 以及 NVIDIA / data tooling;Leaderdrive / 绿的谐波通过 filings 披露 embodied-intelligence-related component revenue and margin。

这些信号让研究从“有没有机器人视频”转向“有没有生产、部署、客户、回本和收入”。但它们还没有完成 S5 commercial proof。下一步真正重要的是 repeat orders、uptime、intervention rate、customer payback、robot revenue 和 supplier humanoid-specific exposure。

9. Source list

Tesla:

Figure AI:

Unitree / 宇树:

Leaderdrive / 绿的谐波:

10. Public-safe flag

Public-safe: yes.

Do not include Hugo private portfolio weights. Do not frame TSLA, 688017.SH, or any supplier/OEM as buy/sell/hold. Do not treat designed capacity, official demos, low price, or share-price moves as commercial proof.